Industrial estate development Preparation of supplementary environmental statements and negotiating with statutory consultees and Local Planning Authorities for a 28 hectare industrial development adjacent to nationally and internationally important ecological areas, Thames Gateway, Isle of Sheppey, Kent.
Roads Preparation of supplementary environmental statements for the construction of a relief road and identification of mitigatory measures for noise mitigation during construction, Isle of Sheppey, Kent.
Roads Stage 2 Environmental Impact Assessment in accordance with DMRB and Web TAG criteria of 9 potential routes for a 15 mile dual carriageway in Essex.
Railways Environment Manager for the the North London Railway Infrastructure Project (NLRIP) to enhance the network between South Acton and Stratford/Barking to improve rail services, including connections with the new East London Railway, in preparation for the 2012 Olympic Games.
Railways Programme manager of a 25 person multidisciplinary team to assess
the impact of the remodelling of 150 kms of the West Coast Mainline. Roads Environment Manager for 3km of dual carriageway through an Area of Outstanding National Beauty (AONB) with a range of protected species
Integrated management system (Quality and Environment) for IS0 14001
certification for a national distributor of building products.
End of life vehicles (ELV) Research into the recycling materials components
and markets for ELVs for a major car manufacturer.
Leaking petrol tanks Desk studies and site investigations to identify the
source of hydrocarbon contamination of soil and groundwater.
Contract management for railways Part of team undertaking pre tender,
and tender assessment and interviewing to selecting design and construct contractors
for Thameslink 2000
Consents management Obtaining planning permissions, Section 61 (Control
of Pollution Act, 1974), discharge consents, footpath diversions for the construction
of the A6 Clapham bypass.
Environment Manager Manageing the archaelogical, ecological and landscape issues for the construction of the A21 Lamberhurst bypass through an Area of Outstanding Natural Beauty.
Technical evaluation. Independant evaluation of the construction and operation of a site for the disposal of 33,000 carcasses from the UK government's Foot and Mouth control programme. |